Testing every phone in every inbound lot is slow and expensive, and testing none of them means you find problems only when a customer does. The practical answer is a written sampling plan: a fixed sample size for each lot size, clear accept/reject thresholds, and a pre-agreed consequence when a sample fails. This guide sets out a plan a reseller can adopt and attach to a purchase agreement. The numbers are working defaults, not a standard. Adjust them to your own risk tolerance and your supplier's track record.

Why sample at all

Intake testing costs labour time per unit, and that time is the same whether the phone is good or bad. A sample gives you an estimate of the defect rate in the whole lot at a fraction of that cost. The aim is not to find every faulty phone. It is to decide, with evidence, whether the lot matches what you were sold, and to preserve your right to claim before the claim window closes.

Sampling works only if the sample is random. Never test the units on top of the pallet or the first box opened. Pull units from several boxes and several positions, and record which boxes they came from.

Sample size by lot size

Use a sliding scale so small lots get proportionally more scrutiny:

  • Up to 50 units: test all units. At this size the labour is modest and one bad unit is a large share of the lot.
  • 51 to 150 units: test 20 units.
  • 151 to 500 units: test 50 units.
  • 501 to 1,200 units: test 80 units.
  • Over 1,200 units: test 125 units, drawn across all boxes.

For a new supplier, move up one band for the first two lots. For a supplier with a clean record over several lots, you can stay at the plan size and add periodic full-box audits instead. If you want to formalise this further, ISO 2859-1 attribute sampling tables are the usual reference, but a simple fixed plan that people actually follow beats a sophisticated one that they skip.

Define what counts as a defect

A threshold is useless unless everyone classifies defects the same way. Split them into three classes:

  • Critical: IMEI blacklisted or mismatched with the paperwork, an activation or MDM lock, a dead unit, a non-original board, or a swapped device model. Tolerance in the sample: zero.
  • Major: battery health below the grade floor, failed camera, microphone, speaker or touch function, a screen fault, or a network failure. Tolerance depends on lot size, set out below.
  • Minor or cosmetic: wear one grade worse than listed, missing accessories where the listing promised them. Tolerance is looser, but track it, because a drift of cosmetic grade across a lot is a pricing issue even when the phones work.

Test against the grade definitions you bought against. The grading standards guide sets out what each grade should look like, so a unit that fails the stated grade is a defect, not a matter of opinion. For what a full functional test covers, see phone testing and quality control. This guide covers only how many to test and what happens next.

Accept and reject thresholds

A workable default for the plan above:

  • Critical defects: one in the sample means reject the lot pending escalation.
  • Major defects: accept if no more than 5% of the sample fails. Between 5% and 10%, expand the sample. Above 10%, reject.
  • Cosmetic mismatches: accept up to 10% one grade lower than listed. Above that, claim a price adjustment rather than rejecting.

On a 50-unit sample, 5% is two units. Decide in advance whether the limit is "two or fewer" or "fewer than two", and write it down. Ambiguity at the threshold is where disputes start.

What a failed sample triggers

Do not respond to a marginal failure by quietly testing a few more units until the result looks better. Use a defined escalation:

  • Step 1, double the sample. If the first sample lands in the middle band, test a second sample of the same size, from different boxes. Judge the two together.
  • Step 2, full inspection. If the combined result still fails, test the whole lot. The cost of this belongs to the supplier under the contract terms below.
  • Step 3, claim. Send the supplier the test records: IMEIs, defect class, box reference and photos. A claim with serial-level evidence is paid. A claim that says "many units were bad" usually is not.

Put it in the contract

A sampling plan binds the supplier only if the purchase terms say so. Ask for these points before the first order:

  • Claim window: a fixed number of days from delivery in which sample-based claims are accepted. Short windows favour the seller, so negotiate one that matches your real intake time.
  • Remedy for a failed sample: replacement, credit or return of the defective units, and who pays freight on a rejected lot.
  • Full-inspection cost: that the supplier bears it when the sample fails, or shares it.
  • Evidence standard: which test records they will accept as proof.
  • Critical defects: that locked, blacklisted or mismatched units are replaceable or refundable regardless of the percentage threshold.

If you are buying from a new supplier, a small trial order is the cheapest way to test the terms as well as the phones. See ordering a sample batch before a full order for how to structure it, and how defective-unit returns work for the process once a claim is raised.

Keep records that support a claim

Log every sampled unit: IMEI, box number, test date, tester, result and defect class. Keep these records for as long as you hold stock from the lot, because defects can surface later in your own returns and you will want to trace them back to a lot and supplier.

SmartChoice supplies lots with unit-level IMEI lists, so you can match your sample against the paperwork on receipt. To see current stock, go to /stock. To agree sampling and claim terms before an order, use /request-quote.

FAQ

How many phones should I test from a 100-unit wholesale lot?

Under the plan above, test 20 units drawn at random across the boxes. If you have no history with the supplier, test the next band up, which is 50 units, for the first couple of lots.

What defect rate is acceptable in a sample?

For critical defects such as blacklisted or locked units, the tolerance is zero. For major functional defects, up to 5% of the sample is a sensible acceptance threshold, with 5% to 10% triggering a second sample and above 10% a rejection. Set the figures in your contract and write them down before the order.

Can I test only the first few boxes?

No. A sample from the top of the pallet is not random and will not hold up in a dispute. Draw units from different boxes and positions and record where each one came from.

Who pays if a sample fails and the whole lot must be inspected?

That is a contract question, and it should be settled before the order. The usual position for a buyer is that the supplier bears the full-inspection cost when the sample shows the lot does not match its description. Without a written term, you are negotiating after the fact.